Excavation at the Emmet Street parking lot is scheduled to begin on or after September 10, 2020. Construction should be expected until January 2022 at minimum. Building permits, once available, will be posted at the construction site. Per the city noise ordinance, activities involving loading, unloading, opening, closing or other handling of boxes, crates, containers, building materials, garbage cans, dumpsters or similar objects must not be done in a manner to cause a noise disturbance between 10 PM and 7 AM. Motorized equipment is not allowed to operate between 8 PM and 8 AM. The developer and general contractor have committed to abide by the City of Chicago noise ordinance.
Was this helpful?